Where this order comes from
“Leveling” means different things to different firms; see house leveling in New Orleans. The closest published description of lifting a house that we could read is FEMA’s homeowner guide chapter on elevating a home. Elevation raises a house to a new height, which is a larger project than leveling, so we use that chapter only for the general nature of the stages. For the permit and paperwork stages we use the City of New Orleans’ own pages, and for the assessment stage the National Park Service. We say which is which below.
1. Someone works out why the house moved
The Park Service advises avoiding remedial treatments without careful diagnosis, and notes that proper diagnosis can take months of monitoring. A floor that is out of level can come from settled supports, but decayed or termite-damaged wood and a damp crawl space can look the same; see house settling, structural wood rot and termite damage. Lifting a house addresses how it is carried. It does not remove the water or the termites.
FEMA’s elevation chapter says a design professional should inspect a house to verify its structural soundness before it is lifted, and warns that lifting an unsound home can lead to expensive damage. Your own dated log and photographs from before any work give everyone the same starting record; our floor, crack and door log is built for that.
2. The scope, the drawings and the permit are settled in writing
For a structural renovation permit the City asks for a signed contract or approved estimate that lists the scope and the cost of labor and materials, plans sealed digitally by a Louisiana-licensed architect or civil engineer, foundation drawings, a benchmark certificate from a registered land surveyor, and either the contractor’s license information or, for owner-occupied residential work, an owner exemption. The City lists a residential review time of two to five business days. Homes in local historic districts need Historic District Landmarks Commission or Vieux Carré Commission approval, and the permit fee carries a surcharge there.
Whether leveling a house at its current height needs that permit is not something the City’s public pages say. They require it for changes to a foundation, beams, load-bearing walls or other structural members, and they do not address leveling or replacing individual piers. The Building Division at (504) 658-7130 is the place to ask. Both the permit page and the City’s permit guide are covered in structural repair permits, including where they disagree about the benchmark certificate.
The Louisiana State Licensing Board for Contractors lists several classifications whose descriptions say they allow a contractor to raise and level buildings, among them Foundations for Buildings, Equipment, or Machinery, and Rigging, House Moving, Wrecking, and Dismantling. The checklist at questions to ask before hiring a foundation or leveling contractor covers how to check.
3. Preparing the house
For whole-house elevation, FEMA says all utility lines, meaning water, sewer, gas, electric and telephone, must be disconnected before the house is lifted. The City adds that electrical and mechanical permits must be applied for before an elevation permit is released, and asks for riggers insurance and engineered foundation drawings. Whether a leveling job at the current height needs any of this is a question for your contractor and the City.
4. Temporary support
FEMA describes the house being held on a cradle of steel beams and jacks, and then on cribbing, because the jacks have limited travel and must be reset. It is supported temporarily again while the foundation is extended. Local firms use the word “shoring” for several different things; see house shoring for what to ask. We do not describe how supports are placed. That is engineered work for licensed contractors.
5. The permanent supports and any wood repairs
The permanent part of a leveling scope can include adding, replacing or adjusting piers, and it may or may not include repairs to sills, beams or joists; compare scopes line by line. The Park Service brief lists reinforcing floor framing weakened by moisture and replacing sill plates among the repairs used where moisture has damaged a building. Termite treatment is a separate licensed trade: the Louisiana Department of Agriculture and Forestry says an individual must be licensed to control pests in structures. See pier and beam foundation repair, and beam and sill repair.
6. Finish repairs
FEMA notes that stucco and brick veneer complicate lifting and must be removed or braced, and that the openings cut in walls for one lifting method must be repaired before the home is habitable. Those details come from elevation. For leveling, ask which finish repairs, such as plaster, drywall, tile and doors, are in the price and which are not, and who does them.
7. Inspections and closeout
The City says its permit fees include normal inspections and the Certificate of Use and Occupancy, and that the permit must be posted where it is visible from the street. Its guide does not describe the inspection sequence or the final inspection process, so ask the Building Division which inspections apply and who schedules them. Ask your contractor what documents you will receive at the end; documentation worth asking for lists some. Keep your log going afterward, so that you can see whether the house stays where it was put.
What we cannot tell you
- How long a job takes, or in what exact order your contractor will work. We found no source for either.
- Whether your job needs a structural permit, utility disconnection, engineer-sealed plans or a historic-district approval. The City’s pages leave leveling at current height unanswered.
- Whether leveling is the right fix for your house. That depends on the cause, which needs an in-person look.
- What it costs. See house leveling cost for why we give no New Orleans figure.
This page is not a how-to. FEMA’s guide says to always use a licensed, bonded and insured contractor for elevation projects, and we would say the same about lifting any house. We are an information and referral site, not a contractor or an engineer. FEMA’s chapter is read in an archived copy that does not show a publication date.
Sources (7)
- FEMA, Homeowner's Guide to Retrofitting (P-312), Chapter 5: Elevating Your Home (archived copy)Read October 28, 2026
- City of New Orleans: Renovation (Structural) / Elevation PermitRead October 7, 2026
- City of New Orleans: Guide to Building PermitsRead October 7, 2026
- City of New Orleans: Floodplain Management (Safety & Permits)Read October 7, 2026
- National Park Service, Preservation Brief 39: Controlling Unwanted Moisture in Historic BuildingsRead October 7, 2026
- Louisiana State Licensing Board for Contractors: examinations and classificationsRead October 28, 2026
- Louisiana Department of Agriculture and Forestry: Structural Pest Control licensingRead October 7, 2026
Next step
If you are weighing a leveling job
Describe what is happening in the house. You do not need to know which stage you are at.
Your request comes to NOLA Raised Home first. If it looks like a fit, we share it with one independent local provider, which decides whether it can help. Not every request is a match. We are not the contractor. How it works.