The permit path, step by step
- Confirm who permits. Jefferson Parish lists Metairie and Jefferson as its main unincorporated areas on the East Bank. The page lists Kenner and Harahan as incorporated municipalities on the East Bank. For Kenner, see foundation repair in Kenner.
- Ask whether the work needs a permit. The parish page on when a permit is needed lists constructing, enlarging, altering, repairing and moving a building, and says minor ordinary repairs may be made with the Building Permits Department’s approval and without a permit. It mentions structural beams and load-bearing supports in that part of the text, and it does not mention foundations by name. From that page we cannot tell you where pier or beam work falls, so ask the department. Our pier repair and replacement guide covers what to photograph first.
- Prepare what the application asks for. The parish’s residential requirements (no date shown) cover new construction, additions, and repairs or renovations to one- and two-family dwellings. They ask for a current stamped survey, and for plans stamped by a registered architect or civil engineer that include a framing plan and construction details and, for foundations, a foundation plan with pile class, length and design load. An owner of a personal residence or a licensed contractor may apply, in the permit office or online. We do not know which of these items apply to a small repair.
- Watch the 50 percent line. If the construction estimate is equal to or more than 50 percent of the existing structure’s fair market value, the same document treats it as a substantial improvement and asks for an itemized estimate from a licensed general contractor, an appraisal or similar value document, and a recent elevation certificate. It says the entire structure must then comply with all current code requirements.
- Check the overlays. The same document lists conditions that may apply: approval for the Old Metairie Neighborhood Conservation District, a tree protection plan in the Metairie Ridge Tree Preservation District, and a permit from the East or West Jefferson Levee District within 1,500 feet of the Mississippi River levee or 300 feet of any other levee.
| Your question | Office to ask | What its page says |
|---|---|---|
| Does my repair need a permit? | Jefferson Parish Building Permits Department | Says it was formerly Inspection and Code Enforcement; lists when a permit is and is not needed. When Do I Need / Not Need a Permit |
| What do I file, and when is an elevation certificate required? | Jefferson Parish Building Permits Department | Lists plan, survey and 50 percent substantial improvement requirements. Residential permit requirements |
| What flood height rules apply to my lot? | Jefferson Parish Floodplain Management & Hazard Mitigation | Points to Chapter 14 and inside-levee and outside-levee ordinance files. Build Responsibly |
| Am I in the Old Metairie district? | Jefferson Parish Planning Department and the Old Metairie Commission | The commission reviews certain land development in the district. Old Metairie Commission |
| Which department is which? | Jefferson Parish | Lists Building Permits, Floodplain Management & Hazard Mitigation and Planning as separate departments. Departments |
Flood and mitigation context
The parish says on its Build Responsibly page that “Land in Jefferson Parish is in a Floodplain” and that its Chapter 14 sets minimum height requirements for residential and non-residential buildings. It links two ordinance files with 2025 in their names, one for inside the levee and one for outside, and its page gives no height figures. A parish Repetitive Loss Area Analysis adopted by the Council on May 16, 2018 counted 5,115 unmitigated repetitive and severe repetitive loss properties as of August 1, 2017, more than 3,500 mitigated ones, and 88,406 federal flood insurance policies in force in unincorporated Jefferson Parish. It names two Metairie study areas, Arcadia Place and Manson Subdivision, and in the part we read gives no Metairie-specific findings. The property counts are as of 2017 and the report is from 2018; the page we read dates the policy count not at all.
The parish’s mitigation FAQ describes a grant-funded elevation program for properties in Jefferson Parish, and names an application deadline of November 16, 2022, which has passed. It says the construction phase for elevation may take about 3 to 6 months and approval 6 to 12 months from application. Treat it as history and check current status with the parish. Our home elevation grants page explains how such programs are generally described and covers New Orleans and St. Charles, not Jefferson Parish.
Soil and subsidence
A 2016 NASA Jet Propulsion Laboratory release on a satellite study of the New Orleans region (June 2009 to July 2012) names Metairie as showing notable subsidence and gives no rate for it. The highest rates it states, up to 2 inches a year, are at industrial areas in Norco and Michoud, not Metairie. It names groundwater pumping and dewatering as the primary contributors. We found no Jefferson Parish page that gives a settling rate, and the study says nothing about any one house. For how settling shows up inside a house, see house settling.
What we could not find about Metairie houses
We found no official or preservation source that describes the foundations of Metairie’s houses, so this page does not say how many are raised, on piers or on slabs. Whether yours is a pier and beam house is something to establish from the house. If it is, pier and beam foundation repair explains how the supports work and pier and beam repair cost gives dated estimates, none of them for Metairie.
What our guides cover
- Pier and beam foundation repair for how a raised house is carried and what common repairs do and do not fix.
- Pier repair and replacement for looking safely at piers and what to ask about replacement.
- Pier and beam repair cost for estimates with their sources and dates.
- Questions to ask before hiring for getting a written scope.
What we cannot tell you
- Whether your pier or beam repair needs a parish permit, plans or an elevation certificate. The parish pages we read do not name foundation work.
- Which flood height applies to your lot, or whether you are inside or outside the levee for the parish ordinance.
- Whether you are in the Old Metairie or Metairie Ridge districts. Ask the parish.
- Whether a parish elevation grant is open now. The only deadline we saw was in 2022.
- What is wrong with your house, or what any repair would cost in Metairie. We name no local price.
The Jefferson Parish pages and the permit requirements show no date, and two parish floodplain pages, the department page and its main mitigation site, could not be opened for this page, so we relied on the parish’s FAQ and its main site. We are an information and referral site, not a contractor, engineer or inspector.
Metairie questions
Who issues permits for pier and beam repair in Metairie?
Jefferson Parish. Its About page lists Metairie as an unincorporated area, and the parish's Building Permits page, which says it was formerly the Department of Inspection and Code Enforcement, handles permits for construction in unincorporated Jefferson Parish. The parish's list of work that needs a permit includes constructing, altering and repairing a building but does not mention foundations by name, so ask the department whether your pier or beam work needs one.
Do I need plans or an elevation certificate for a repair in Metairie?
It depends on the cost. The parish's residential permit requirements (no date shown) say plans are stamped by a registered architect or civil engineer and must include a foundation plan listing pile class, length and design load. If a contractor's estimate is equal to or more than 50 percent of the existing structure's fair market value, the document says it is a substantial improvement, a recent elevation certificate is required, and the entire structure must comply with all current code requirements. We cannot tell you whether a small pier repair needs plans.
I live in Old Metairie. Is there extra approval?
The parish's residential permit requirements say the Old Metairie Neighborhood Conservation District requires approval and to contact the Planning Department during the planning stage. The Old Metairie Commission page says the commission reviews certain land development in the district, naming new houses, demolition and swimming pools as examples, and does not mention foundations. Ask the Planning Department whether your work is reviewed.
Does Jefferson Parish have its own flood rules for building and repair?
Yes. The parish's Build Responsibly page says "Land in Jefferson Parish is in a Floodplain" and points to Chapter 14 of its Code of Ordinances, which sets minimum height requirements. It links two ordinance files with 2025 in their names, one for inside the levee and one for outside, and gives no height figures on the page. We cannot tell you the height that applies to your lot.
Is Metairie sinking?
A 2016 NASA Jet Propulsion Laboratory release on a satellite study of the New Orleans region (June 2009 to July 2012) says Metairie showed notable subsidence but gives no rate for it. The highest rates it names, up to 2 inches a year, were at industrial areas in Norco and Michoud. It says the primary contributors were groundwater pumping and dewatering. It describes a region, not your house, and we found no Jefferson Parish page that gives a settling rate for Metairie.
Sources (10)
- Jefferson Parish: About Jefferson Parish (no date shown)Read October 30, 2026
- Jefferson Parish: Departments (no date shown)Read October 30, 2026
- Jefferson Parish: Building Permits (no date shown)Read October 30, 2026
- Jefferson Parish: When Do I Need / Not Need a Permit (no date shown)Read October 30, 2026
- Jefferson Parish: Requirements for Submittal of Residential Building Permit Application (no date shown)Read October 30, 2026
- Jefferson Parish: Build Responsibly (Floodplain Development Requirements) (no date shown; links 2025 ordinance files)Read October 30, 2026
- Jefferson Parish: Repetitive Loss Area Analysis, adopted by Council May 16, 2018Read October 30, 2026
- Jefferson Parish Floodplain Management & Hazard Mitigation: FAQ (names an application deadline of November 16, 2022)Read October 30, 2026
- Jefferson Parish: Old Metairie Commission (2026 meeting schedule shown)Read October 30, 2026
- NASA Jet Propulsion Laboratory: New Study Maps Rate of New Orleans Sinking (May 16, 2016)Read October 30, 2026
Next step
If you are in Metairie and the floor is moving
Describe the house, what you see under it if you can, and what you are noticing inside. You do not need to know the repair.
Your request comes to NOLA Raised Home first. If it looks like a fit, we share it with one independent local provider, which decides whether it can help. Not every request is a match. We are not the contractor. How it works.